Project:
Consulting Services for the Construction Supervision and Management Work of Nupche Likhu Hydropower Project (57.5 MW)
Client:
Vision Energy and Power Pvt. Ltd
Date:
Ongoing
Project:
Bid Evaluation from different contractor, design review, additional geophysical & geotechnical investigation if deemed necessary & design support during construction of Lower Erkhuwa Hydropower Project (14.15 MW)
Client:
Lower Erkhuwa Hydropower Pvt. Ltd.
Date:
Ongoing
Project:
Feasibility Study of Gupche Khola Hydropower Project (7.5 MW)
Client:
Multi Energy Development Pvt. Ltd.
Date:
Ongoing
Project:
Detailed Engineering Design of Upper Nyasem Khola A Hydropower Project (21 MW)
Client:
Sindhujwala Hydropower Company Limited
Date:
Ongoing
Project:
Detailed Engineering Design of Upper Nyasim Khola Hydropower Project (43 MW)
Client:
Sindhu Jwala Hydropower Company Limited
Date:
Ongoing
Project:
Detailed Engineering Design of Upper Myagdi Hydropower Project (37 MW)
Client:
Hydro Empire Pvt. Ltd.
Date:
Ongoing
Project:
Detailed Engineering Design of Nupche Likhu Hydropower Project (57.5 MW)
Client:
Vision Energy and Power Pvt. Ltd
Date:
March 2018 to September 2019
Project:
Feasibility Study Report of Suni Gad Hydropower Project (11.05 MW)
Client:
Omega Energy Developers Pvt. Ltd
Date:
June 2017 to July 2018
Project:
Feasibility Study Report of Doodhpokhari Chepe Hydropower Project (8. MW)
Client:
Doodhpokhari Chepe Hydropower Company Pvt. Ltd.
Date:
November 2017 to July 2018
Project:
Feasibility Study Report of Nupche Likhu Hydropower Project (57.5 MW)
Client:
Vision Energy and Power Pvt. Ltd
Date:
June 2017 to April 2018
Project:
Detailed Engineering Design of Suni Gad Hydropower Project (11.05 MW)
Client:
Omega Energy Developers Pvt. Ltd.
Date:
April 2018 to November 2020
Project:
Detailed Engineering Design of Lower Erkhuwa Hydropower Project (14.15 MW)
Client:
Lower Erkhuwa Hydropower Pvt. Ltd.
Date:
February 2019 to September 2020
Project:
Due Diligence Study Mid Hongu Khola-B Hydropower Project (22.9 MW)
Client:
Gaurishankar Power Development Pvt. Ltd.
Date:
Completed
Project:
Due Diligence Study of Hadi Khola (Sunkoshi A) Hydropower Project (997 KW)
Client:
Century Energy Pvt. Ltd.
Date:
Completed
Project:
Due Diligence Study of Upper Ankhu Khola Hydropower Project (38 MW)
Client:
Dhading Ankhu Khola Hydro Pvt. Ltd.
Date:
Completed
Project:
Due Diligence Study of Mid Hongu A Hydropower Project (22 MW)
Client:
Apex Makalu Hydropower Pvt. Ltd.
Date:
Completed