Feasibility Study of Suni Gad Hydropower Project (11.05 MW)

  • Project: Feasibility Study Report of Suni Gad Hydropower Project (11.05 MW)
  • Client: Omega Energy Developers Pvt. Ltd
  • Location: Surma Rural Municipality, Telkot Rural Municipality and Jai Prithivi Municipality of Bajhang district in the Province No.7
  • Date: June 2017 to July 2018

 

 

The project consist of preparation of Feasibility Study Report of Suni Gad Hydropower Project (11.05MW), carry out the construction planning and scheduling and preparation of drawings. The consultant has completed all the assignment as per ToR.

The proposed Suni Gad Hydropower Project (11.05MW) is located in Chainpur Municipality of Bajhang District .The project area can be reached through Kathmandu-Chainpur (Bajhang) road followed by gravel road up to Rajkuda from Chainpur. Around 4.8 km access road shall be constructed to reach power house site from Rajkuda. Suni Gad Hydropower Project is a run-of-river type of hydropower project and has installed capacity of 11.05MW with design discharge of 3.95m3/sec and rated net head of 328.27m. The project is capable of delivering 81.86GWh of energy annually to NEA grid at proposed 33kV substation at Chainpur.

Overall services provided by firm

The scope of services will include, but not limited to, carrying out the following activities:


  • Supervise Detailed topographic survey of headwork site, powerhouse, pipe alignment 6950 m and access roads.

  • Hydrological analysis,rating curve, low flow analysis and sediment study.

  • Geological assessment and assessment of construction materials, Estimation of energy generation.

  • Detailed Hydraulic of project components.

  • Powerhouse surface type 37 m x 21.58 m x 11.85 m with provision of 2 units of Pelton turbines Brushless Synchronous, Centre Line of Runners

  • Design of 5 km Access Road and 13 km Project Road

  • Study of 33 kV transmission line for National Grid to Chainpur Substation, Bajhang

  • Preparation of rate analysis, quantity estimate and cost estimation.

  • Preparation of construction schedule.

  • Supervise Social and environmental monitoring with recommendation and implementation of appropriate social and environmental mitigation measures.


 

 

Related Project

Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Project: Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Project: Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Baglung-Beu-Narethati Road Tunnel (7.5 km)

Project: Feasibility Study of Baglung-Beu-Narethati Road Tunnel (7.5 km)

Client: Department of Roads, Quality Research & Development Center (QRDC)

Date: Ongoing

Become a Client

Let's work together for better tomorrow. We help you organize and build your infrastructure projects.

Contact Us

Become our Partner

We have been providing value added services to foreign consulting firms from across the globe who may be interested to establish the business activities in Nepal.

Become Our Partners

Join Our Team

Work with passionate & result oriented people who are expert in their field and makes remarkable impact on what they are doing partnering with clients and community.

Career