| 1 |
Due Diligence Study Mid Hongu Khola-B Hydropower Project (22.9 MW) |
Mahakulung Rural Municipality, ward number-2 (former Chheskam, Bun and Gudel VDC) and Sotang Rural Municipality, Ward no. 4 and 5 (former Sotang and Bun VDC) of Solukhumbu District, Province No. 1 |
Gaurishankar Power Development Pvt. Ltd. |
Completed |
Read More |
| 2 |
Due Diligence Study of Myagdi Khola Hydropower Project (57.3 MW) (Hydrology) |
Bagara Village, Dhaulagiri Rural Municipality, Myagdi District, Gandaki Province |
Hydro Village Pvt. Ltd. |
Completed |
Read More |
| 3 |
Feasibility Study and Preparation of Tender Documents for 132 kV Double Circuit Transmission Line |
Umakunda Rural Municipality, Ramechhap District, Nepal |
Vision Energy and Power Pvt. Ltd |
Completed |
Read More |
| 4 |
Updated Feasibility Study and Tender Document Preparation of Lower Erkhuwa Hydropower Project (14.15 MW) |
Khadananda Municipality (former Nepale Dada and Chauki Dada VDCs) of Bhojpur District, Province no. 1 |
Lower Erkhuwa Hydropower Pvt. Ltd. |
Completed |
Read More |
| 5 |
Detailed Engineering Design of Lower Erkhuwa Hydropower Project (14.15 MW) |
Khadananda Municipality (former Nepale Dada and Chauki Dada VDCs) of Bhojpur District, Province no. 1 |
Lower Erkhuwa Hydropower Pvt. Ltd. |
February 2019 to September 2020 |
Read More |
| 6 |
Detailed Engineering Design of Suni Gad Hydropower Project (11.05 MW) |
Surma Rural Municipality, Telkot Rural Municipality and Jai Prithivi Municipality of Bajhang district in the Province No.7 |
Omega Energy Developers Pvt. Ltd. |
April 2018 to November 2020 |
Read More |
| 7 |
Feasibility Study of Suni Gad Hydropower Project (11.05 MW) |
Surma Rural Municipality, Telkot Rural Municipality and Jai Prithivi Municipality of Bajhang district in the Province No.7 |
Omega Energy Developers Pvt. Ltd |
June 2017 to July 2018 |
Read More |
| 8 |
Feasibility Study of Nupche Likhu Hydropower Project (57.5 MW) |
Umakunda Rural Municipality, Ramechhap District, Bagmati Province, Nepal |
Vision Energy and Power Pvt. Ltd |
June 2017 to April 2018 |
Read More |
| 9 |
Feasibility Study of Doodhpokhari Chepe Hydropower Project (8.8 MW) |
Ajirkot Rural Municipality, Gorkha District, Nepal |
Doodhpokhari Chepe Hydropower Company Pvt. Ltd. |
November 2017 to July 2018 |
Read More |
| 10 |
Detailed Engineering Design of Nupche Likhu Hydropower Project (57.5 MW) |
Umakunda Rural Municipality, Ramechhap District, Bagmati Province, Nepal |
Vision Energy and Power Pvt. Ltd |
March 2018 to September 2019 |
Read More |