The project consist of preparation of Feasibility Study and preparation of tender document of 132 kV double circuit transmission line project that has been proposed to evacuate the power generated from Nupche-Likhu Hydropower Project (57.5MW). The Consultant has completed all the assignment as per ToR.
The project consist of 24 km long 132 kV double Circuit Transmission Line for the Nupche Likhu Hydropower Project, with a capacity of 57.5 MW located in Umakunda Rural Municipality of Ramechhap district, Province No. 3, Nepal. The 132 kV Transmission Line is intended to be installed from GIS Switchyard of Nupche Likhu Hydropower Project (near Kongematar Village of Umakunda Rural Municipality) to NEA Substation at Gargyang of Gokulganga Rural Municipality.