| 1 |
Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW) |
Sabhapokhari Rural Municipality, Sankhuwasabha District, Province-1 |
Sankhuwasaba Power Development Pvt. Ltd. |
Completed |
Read More |
| 2 |
Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW) |
Sabhapokhari Rural Municipality, Sankhuwasabha District, Province-1 |
Sankhuwasaba Power Development Pvt. Ltd. |
Completed |
Read More |
| 3 |
Bill Verfication of Super Aankhu Khola Hydropower Project (25 MW) |
Lapa and Sertung VDCs, Dhading District |
Gorakshya Hydropower Pvt.Ltd |
Ongoing |
Read More |
| 4 |
Baglung-Beu-Narethati Road Tunnel (7.5 km) |
Baglung District, Nepal |
Department of Roads, Quality Research & Development Center (QRDC) |
September 2023 |
Read More |
| 5 |
To develop an optimization framework for the real-time optimum intake of water from diverse water sources in Kathmandu Valley |
Kathmandu District, Lalitpur District and Bhaktapur District |
Water and Energy Commission Secretariat (WECS) |
June 2025 |
Read More |
| 6 |
Analysis of Flood, Drought and Climate in Nepal |
Nepal |
Water and Energy Commission Secretariat (WECS) |
April 2025 |
Read More |
| 7 |
Construction Supervision and Management Works of 132 kV Double Circuit Transmission Line |
Umakunda Rural Municipality, Ramechhap District, Bagmati Province, Nepal |
Vision Energy and Power Limited |
Ongoing |
Read More |
| 8 |
Nupche Likhu Hydropower Project (57.5 MW) – Consulting Services for Project Management & Construction Supervision |
Umakunda Rural Municipality, Ramechhap District, Bagmati Province, Nepal |
Vision Energy and Power Pvt. Ltd |
Ongoing |
Read More |
| 9 |
Detailed Engineering Design of Upper Nyasim Khola Hydropower Project (43 MW |
Jugal Rural Municipality, Sindhupalchowk District, Nepal |
Sindhu Jwala Hydropower Company Limited |
Ongoing |
Read More |
| 10 |
Bagmati Action Plan |
Kathmandu |
High Powered Committee for Integrated Development of Bagmati Civilization |
Completed |
Read More |