To develop an optimization framework for the real-time optimum intake of water from diverse water sources in Kathmandu Valley

  • Project: To develop an optimization framework for the real-time optimum intake of water from diverse water sources in Kathmandu Valley
  • Client: Water and Energy Commission Secretariat (WECS)
  • Location: Nepal
  • Date: Ongoing

The overall objective of the study is to prepare a model/algorithm of Kathmandu Valley which optimizes the use of multi-water resources available meeting the multi-water demands in the valley.

Overall services provided by firm

The scope of the consultancy services includes, but not limited to, following major activities:


  • Identify all the existing sources of water in Kathmandu Valley and nearby areas.

  • Uncover the multi-use of water in terms of quality and quantity.

  • Collect the information on current demand and availability of water in different sector in Kathmandu Valley.

  • Collect all the information on all pipelines (age, capacity, size, no of households that are benefitted, condition etc.) on the distribution system of water resources that are currently in use or can be utilized.

  • Check the water balance in terms of water availability, multi-demand and multi-use of water.

  • Check the water quality criteria which serve as a baseline for establishing water quality objectives in conjunction with information on water uses and side-specific factors.

  • Ensure the designated use of water, based on quality like its use for drinking-water supply, livestock watering, irrigation, fisheries, recreation or other purposes, while supporting and maintaining aquatic ecosystems and any.

  • Analysis data and information obtained and collected.

  • Optimization sensitivity analysis should be carried out.

  • Calculate and predict (forecasting) the multi-water resources and multi-water demands with their quantity of the study areas.

  • Mapping of all the water resources, water demands, etc. in GIS.

  • Develop an optimization framework/model for real-time optimum intake of water from diverse water sources to enable a sustainable water supply system.

  • Develop the cost curve of the intake, treatment and distribution system and prepare a comprehensive report and submit to the client.

Related Project

Preparation of Master Plan and Detailed Engineering Design for the improvement of the Dhobikhola Corridor and Kapan-Budanilkantha Flood/Inundation Control

Project: Preparation of Master Plan and Detailed Engineering Design for the improvement of the Dhobikhola Corridor and Kapan-Budanilkantha Flood/Inundation Control

Client: Dhobikhola Corridor and Kapan-Budanilkantha Flood Control Project

Date: Ongoing

Detailed Engineering Design of Brahmayani Hydroelectric Project (45 MW)

Project: Detailed Engineering Design of Brahmayani Hydroelectric Project (45 MW)

Client: Bramhayani Hydropower Company Pvt. Ltd.

Date: Ongoing

Bill Verfication of Super Aankhu Khola Hydropower Project (25 MW)

Project: Bill Verfication of Super Aankhu Khola Hydropower Project SAKHP (25 MW)

Client: Gorakshya Hydropower Pvt.Ltd

Date: Ongoing

Become a Client

Let's work together for better tomorrow. We help you organize and build your infrastructure projects.

Contact Us

Become our Partner

We have been providing value added services to foreign consulting firms from across the globe who may be interested to establish the business activities in Nepal.

Become Our Partners

Join Our Team

Work with passionate & result oriented people who are expert in their field and makes remarkable impact on what they are doing partnering with clients and community.

Career