National

National

Detailed Engineering Design of Brahmayani Hydroelectric Project (45 MW)

Project: Detailed Engineering Design of Brahmayani Hydroelectric Project (45 MW)

Client: Bramhayani Hydropower Company Pvt. Ltd.

Date: Ongoing

Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Project: Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Project: Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Bill Verfication of Super Aankhu Khola Hydropower Project (25 MW)

Project: Bill Verfication of Super Aankhu Khola Hydropower Project SAKHP (25 MW)

Client: Gorakshya Hydropower Pvt.Ltd

Date: Ongoing

Baglung-Beu-Narethati Road Tunnel (7.5 km)

Project: Feasibility Study of Baglung-Beu-Narethati Road Tunnel (7.5 km)

Client: Department of Roads, Quality Research & Development Center (QRDC)

Date: September 2023

To develop an optimization framework for the real-time optimum intake of water from diverse water sources in Kathmandu Valley

Project: To develop an optimization framework for the real-time optimum intake of water from diverse water sources in Kathmandu Valley

Client: Water and Energy Commission Secretariat (WECS)

Date: June 2025

Analysis of Flood, Drought and Climate in Nepal

Project: Analysis of Flood, Drought and Climate in Nepal

Client: Water and Energy Commission Secretariat (WECS)

Date: April 2025

Construction Supervision and Management Works of 132 kV Double Circuit Transmission Line

Project: Construction Supervision and Management Works of 132 kV Double Circuit Transmission Line from Nupche Likhu Powerhouse (57.5 MW) To Garjyang Sub-Station

Client: Vision Energy and Power Limited

Date: Ongoing

Initial Environmental Examination (IEE) Study of 132 kV Transmission Line of Khimti-2 Hydroelectric Project (48.8 MW)

Project: Conducting Initial Environmental Examination (IEE) Study of 132 kV Transmission Line of Khimti-2 Hydroelectric Project (48.8 MW)

Client: People's Energy Limited

Date: Ongoing

Become a Client

Let's work together for better tomorrow. We help you organize and build your infrastructure projects.

Contact Us

Become our Partner

We have been providing value added services to foreign consulting firms from across the globe who may be interested to establish the business activities in Nepal.

Become Our Partners

Join Our Team

Work with passionate & result oriented people who are expert in their field and makes remarkable impact on what they are doing partnering with clients and community.

Career