The project consists of preparation of Due Diligence Study of the project for financing purpose with the consortium of banks which is lead by Citizen Investment bank. The Consultant has completed all the assignments as per ToR.
The project will utilize the flow available in Ankhu Khola, the tributary of Budhi Gandaki River in the Narayani Basin. As per the Power Purchase Agreement (PPA), the design discharge of the project is 16.01 m3/s at probability exceedance of 40.65 %.
The headworks arrangement of the project is located at the right bank of Ankhu Khola about 80 m downstream of the confluence of Lapa Khola and Ankhu Khola. The project is designed for a design discharge of 16.01 m3/s with a gross head of 277.50 m as per the Updated Feasibility Study Report. Based on available reports & drawings, the diversion weir of the project is proposed at 1184.50 m amsl and tail water level of the project is 907.00 m amsl.