Some glimpses of transmission (132 kV) feasibility study activities for Khimti 2 Hydropower Project.
The introduction of special Loop In Loop Out arrangement at middle of NEA 132 kV Transmission line to the project not only reduced the transmission line length by more than 80% (previously more than 10 km long 132 kV transmission line was proposed while new option will have less than 2 km in length) but also reduces the social and environmental cost in the same ratio moreover it mitigate the limitation of connection bay at the main NEA substation.