Design Support During Construction of Lower Erkhuwa Hydropower Project (14.15 MW)

  • Project: Bid Evaluation from different contractor, design review, additional geophysical & geotechnical investigation if deemed necessary & design support during construction of Lower Erkhuwa Hydropower Project (14.15 MW)
  • Client: Lower Erkhuwa Hydropower Pvt. Ltd.
  • Location: Khadananda Municipality (former Nepale Dada and Chauki Dada VDCs) of Bhojpur District, Province no. 1
  • Date: Ongoing

EI Maven Pvt. Ltd. as consultant has already complete the updated feasibility  study, detail engineering design and tender document preparation for Lower Erkhuwa Hydropower Project (14.15 MW).  Based on the track record of our quality & excellent services, the client has once again engaged EI Maven in the project for bid evaluation from different contractor, design review, additional geophysical & geotechnical investigation if deemed necessary & design support during construction.

The proposed Lower Erkhuwa Khola Hydropower Project (14.15 MW) is located in Khadananda Municipality of Bhojpur District. The project area can be reached through Kathmandu-Tumlingtar (Sankhuwasabha) road followed by gravel road up to Chewabesi from Tumlingtar. The road from Bhojpur to Majuwabesi  (Powerhouse site) is single lane fair weather earthen track (about 49 km). Lower Erkhuwa Khola Hydropower Project is a run-of-river type of hydropower project and has installed capacity of 14.15 MW with design discharge of 11.20 m3/sec and rated net head of 145.78 m. The project is capable of delivering 79.79 GWh of energy annually to NEA grid at proposed Sitalpati 33kV substation at Shankhuwashabha.

Know more about the project

Overall Services provided by firm

The scope of services will include, but not be limited to, carrying out the following activities:


  • Bid evaluation of different packages (Civil - Underground, Civil - Surface Works, Electromechanical Works, Hydro-mechanical works).

  • Review of different components as per the updated site information, recommend change if necessary and design the components to meet the requirements for the updated site conditions. 

  • Additional Geotechnical & Geophysical Investigation if required

  • Geotechnical & Structural analysis & design.

  • Prepare bar bending schedule.

Related Project

Preparation of Master Plan and Detailed Engineering Design for the improvement of the Dhobikhola Corridor and Kapan-Budanilkantha Flood/Inundation Control

Project: Preparation of Master Plan and Detailed Engineering Design for the improvement of the Dhobikhola Corridor and Kapan-Budanilkantha Flood/Inundation Control

Client: Dhobikhola Corridor and Kapan-Budanilkantha Flood Control Project

Date: Ongoing

Detailed Engineering Design of Brahmayani Hydroelectric Project (45 MW)

Project: Detailed Engineering Design of Brahmayani Hydroelectric Project (45 MW)

Client: Bramhayani Hydropower Company Pvt. Ltd.

Date: Ongoing

Bill Verfication of Super Aankhu Khola Hydropower Project (25 MW)

Project: Bill Verfication of Super Aankhu Khola Hydropower Project SAKHP (25 MW)

Client: Gorakshya Hydropower Pvt.Ltd

Date: Ongoing

Become a Client

Let's work together for better tomorrow. We help you organize and build your infrastructure projects.

Contact Us

Become our Partner

We have been providing value added services to foreign consulting firms from across the globe who may be interested to establish the business activities in Nepal.

Become Our Partners

Join Our Team

Work with passionate & result oriented people who are expert in their field and makes remarkable impact on what they are doing partnering with clients and community.

Career