The project consist of preparation of Feasibility Study of 132 kV single circuit transmission line project that has been proposed to evacuate the power generated from Khimti-2 Hydropower Project (48.8 MW).
The project consist of 3 km long 132 kV single Circuit Transmission Line for the Khmti-2 Hydropower Project, with a capacity of 48.8 MW located in Tamakoshi & Gokulganga Rural Municipality of Dolkha & Ramechhap district, Province No. 3, Nepal. The 132 kV Transmission Line is intended to be installed from Switchyard of Khmti-2 Hydropower Project to Loop In Loop Out (LILO) switching station in appropriate location between Garjyang to New Khimti 132 kV NEA Double Circuit Transmission Line.