132 kV Single Circuit Transmission Line from Khimti-2 Powerhouse (48.8 MW) To LILO Switching Station in Appropriate Location Between Garjyang To New Khimti 132 kV NEA Double Circuit Transmission Line

  • Project: 132 kV Single Circuit Transmission Line from Khimti-2 Powerhouse (48.8 MW) To LILO Switching Station in Appropriate Location Between Garjyang To New Khimti 132 kV NEA Double Circuit Transmission Line
  • Client: People's Energy Limited
  • Location: Tamakoshi Rural Municipality, Dolakha District and Gokulganga Rural Municipality Ramechhap District, Bagmati Province, Nepa
  • Date: Completed
  • Year Completed: Feb 2022

The project consist of preparation of Feasibility Study of 132 kV single circuit transmission line project that has been proposed to evacuate the power generated from Khimti-2 Hydropower Project (48.8 MW).

The project consist of 3 km long 132 kV single Circuit Transmission Line for the Khmti-2 Hydropower Project, with a capacity of 48.8 MW located in Tamakoshi & Gokulganga Rural Municipality of Dolkha & Ramechhap district, Province No. 3, Nepal. The 132 kV Transmission Line is intended to be installed from Switchyard of Khmti-2 Hydropower Project to Loop In Loop Out (LILO) switching station in appropriate location between Garjyang to New Khimti 132 kV NEA Double Circuit Transmission Line.

Know more about the project

Overall Services provided by firm

The scope of services will include, but not be limited to, carrying out the following activities:


  • Analysis of possible alternative alignments based on desk study.

  • Walkover survey of the possible transmission line alignments

  • Identification & Finalization of best site for LILO Switching station in between existing Garjyang To New Khimti 132 kV NEA double circuit Transmission Line 

  • Fix the best transmission line alignment route for further field verifications and detailed topographic survey of the selected route.

  • Tower spotting and foundation design

  • Quantity & Cost estimation of the project

  • Number of settlements affected and crossing of highway and densely populated area.

  • Detailed Feasibility Study of 132 kV Single Circuit Transmission Line from Khimti-2 Powerhouse (48.8 MW) To LILO Switching Station in Appropriate Location Between Garjyang To New Khimti 132 kV NEA Double Circuit Transmission Line

Related Project

Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Project: Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Project: Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Baglung-Beu-Narethati Road Tunnel (7.5 km)

Project: Feasibility Study of Baglung-Beu-Narethati Road Tunnel (7.5 km)

Client: Department of Roads, Quality Research & Development Center (QRDC)

Date: Ongoing

Become a Client

Let's work together for better tomorrow. We help you organize and build your infrastructure projects.

Contact Us

Become our Partner

We have been providing value added services to foreign consulting firms from across the globe who may be interested to establish the business activities in Nepal.

Become Our Partners

Join Our Team

Work with passionate & result oriented people who are expert in their field and makes remarkable impact on what they are doing partnering with clients and community.

Career