Due Diligence of Hadi (Sunkoshi A) Hydropower Project (997 KW)

  • Project: Due Diligence Study of Hadi Khola (Sunkoshi A) Hydropower Project (997 KW)
  • Client: Century Energy Pvt. Ltd.
  • Location: Gorthanli VDC of Sindupalanchowk district
  • Date: Completed

The project consist of preparation of Due Diligence Study of the project for financing purpose with the consortium of banks which is lead by Siddhartha bank. The Consultant has completed all the assignment as per ToR.

Hadi Khola (Sunkoshi) A Small Hydropower Project is a run of river project proposed with installed capacity of 997 kW that generates 7.80 GWh of energy annually.  The headworks of the project lie on the left bank of the Hadi Khola, about 200m upstream of the confluence of Khonawa Khola with Hadi Khola at Chyanarsa village. Water from Khonawa Khola will be added during the dry months by construction of suitable water intake at Khonawa Khola nearly 500m upstream of the Khonawa and Hadi confluence. Water from both intake is conveyed from the intake and reaches the single desander proposed at the cultivated land in the left bank of Hadi khola after crossing the Khonawa khola in a closed conduit. The pipe alignment is proposed to follow the left bank of the Hadi Khola and the
pipe would pass through the forest and cultivated land up to the proposed forebay near Pipal danda village. A greater segment of the length will be low pressure pipe and beyond the forebay, the pipe will be high pressure penstock. The pipe is mainly buried with occasional exposure on river crossings and valleys. The Powerhouse is to be located on the right bank of Sunkoshi river at the terrace at a coordinate of 270 46’ 55” N and 850 57’ 49”E.

 

Overall Services provided by firm

The scope of services includes, but not limited to, carrying out the following activities:


  • Review of the studies including hydrology, in general geology of the project area

  • Review of the project layout and project component design parameters

  • Review of the project cost estimates

  • Review of existing environment and likely adverse impacts.

  • Brief assessment of risk factors in the project

  • Review installed capacity and annual energy

  • Conclusion and Recommendation based on the findings.

  • Prepare of Due Diligence Report

Related Project

Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Project: Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Project: Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Baglung-Beu-Narethati Road Tunnel (7.5 km)

Project: Feasibility Study of Baglung-Beu-Narethati Road Tunnel (7.5 km)

Client: Department of Roads, Quality Research & Development Center (QRDC)

Date: Ongoing

Become a Client

Let's work together for better tomorrow. We help you organize and build your infrastructure projects.

Contact Us

Become our Partner

We have been providing value added services to foreign consulting firms from across the globe who may be interested to establish the business activities in Nepal.

Become Our Partners

Join Our Team

Work with passionate & result oriented people who are expert in their field and makes remarkable impact on what they are doing partnering with clients and community.

Career