Preparation of Tender Documents for 33 kV Single Circuit Transmission Line from Suni Gad Powerhouse to NEA Substation at Chainpur

  • Project: Preparation of Tender Documents for 33 kV Single Circuit Transmission Line from Suni Gad Powerhouse to NEA Substation at Chainpur
  • Client: Omega Energy Developers Pvt. Ltd
  • Location: Surma Rural Municipality, Telkot Rural Municipality and Jai Prithivi Municipality of Bajhang district in the Province No.7
  • Date: Completed

The project consist of preparation of complete set of tender documents for 33 kV Single Circuit Transmission Line from Suni Gad Powerhouse to NEA Substation at Chainpur to evacuate 11.05 MW power generated from Suni Gad HPP. The Consultant is has already submitted the draft tender documents as ToR and is in the stage of final submission the tender documents.

The project consist of 10 km long 33 kV Single Circuit Transmission Line for the Suni Gad Hydropower Project, with a capacity of 11.05 MW located in Surma Rural Municipality, Telkot Rural Municipality and Jai Prithivi Municipality of Bajhang district in the Far Western Province. The 33 kV Transmission Line is intended to be installed from outdoor Switchyard of Suni Gad Hydropower Project to NEA Substation at Chainpur Municipality.

Overall Services provided by firm

The scope of services includes, but not limited to, carrying out the following activities:


  • Review Desk Study report and carry out walkover survey on transmission line route and select the most feasible alignment among different possible transmission line route alignments from Suni Gad Hydropower Project switchyard to NEA substation at Chainpur.

  • Carry out detailed survey of the selected alignment

  • Carry out geological study of the selected alignment

  • Carryout tower spotting on the proposed transmission line alignment

  • Carryout the verification survey on the location of angle points and intermediate points

  • Preparation of Complete Tender Documents

Related Project

Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Project: Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Project: Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Baglung-Beu-Narethati Road Tunnel (7.5 km)

Project: Feasibility Study of Baglung-Beu-Narethati Road Tunnel (7.5 km)

Client: Department of Roads, Quality Research & Development Center (QRDC)

Date: Ongoing

Become a Client

Let's work together for better tomorrow. We help you organize and build your infrastructure projects.

Contact Us

Become our Partner

We have been providing value added services to foreign consulting firms from across the globe who may be interested to establish the business activities in Nepal.

Become Our Partners

Join Our Team

Work with passionate & result oriented people who are expert in their field and makes remarkable impact on what they are doing partnering with clients and community.

Career