Geotechnical Investigation of Likhu Khola Hydropower Project (30 MW)

  • Project: Geotechnical Investigation of Likhu Khola Hydropower Project (30 MW)
  • Client: Pike Hydropower Company Limited
  • Location: Khiji Demba Rural Municipality-3&7, Okhaldhunga District
  • Date: Completed

The project consist of Geotechnical Investigation of Likhu Khola Hydropower Project (30 MW. The consultant has completed all the assignment as per ToR.

Likhu Khola Hydropower Project is a run-of-the-river type scheme located at Rawadolu, Kubu Kasthali, Khiji Kati, Khiji Chandeswori and Preeti VDCs of Okhaldhunga & Ramechhap district of Sagarmatha and Janakpur zones of Central Region of Nepal. The headworks site is located 250m downstream of the confluence of Likhu river and Sapsu khola.  The powerhouse is located immediately downstream of the suspension bridge over Likhu Khola at Tosipa village.  The approximate distances of powerhouse and headworks of proposed project from Bhandara Bazaar, the nearest Bazaar from the project area, 8 and 12 km respectively.

Overall Services provided by firm

The scope of services will include, but not be limited to, carrying out the following activities:


  • Core drilling works at Likhu Khola in Headworks, HRT inlet portal, surge shaft, Powerhouse turbine Unit-1&2.

  • Total 7 nos. Of drill hole location 2-BH at Headworks, 1 –BH at HRT inlet portal, 2-BH at surge shaft and 2-BH at Powerhouse.

  • Core drilling upto maximum depth of 20m.

  • Field test such as Packer/Lugeon test, Permeability test at an interval of 3m.

  • Field test such as SPT/CPT at overburden strata.

  • Extraction and packing of core sample on corebox, each box with maximum 5 m depth sample.

  • Laboratory test such as Unit weight, specific gravity, bulk density, point load test, UCS test, Brazilian tensile strength test.

  • Preparation of field log and laboratory test results.

  • Analysis of data, conclusion and recommendation of design parameters

Related Project

Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Project: Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Project: Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Baglung-Beu-Narethati Road Tunnel (7.5 km)

Project: Feasibility Study of Baglung-Beu-Narethati Road Tunnel (7.5 km)

Client: Department of Roads, Quality Research & Development Center (QRDC)

Date: Ongoing

Become a Client

Let's work together for better tomorrow. We help you organize and build your infrastructure projects.

Contact Us

Become our Partner

We have been providing value added services to foreign consulting firms from across the globe who may be interested to establish the business activities in Nepal.

Become Our Partners

Join Our Team

Work with passionate & result oriented people who are expert in their field and makes remarkable impact on what they are doing partnering with clients and community.

Career