The project consist of preparation of Geophysical Investigation of Upper Nyasem Khola Hydroelectric Project (43 MW), carry out the construction planning and scheduling and preparation of drawings. The consultant has completed all the assignment as per ToR.
The proposed Upper Nyasem Khola Hydroelectric Project (43 MW) is located in Jugal Rural Municipality, Bagmati Province, Nepal. The project area can be reach through a gravel road from Balephi up to Ambakharka. Ambakharka is located at a distance of about 45 km from Balephi Bazaar which is located on Araniko Highway. Balephi bazaar is located about 72 km north from Kathmandu. Upper Nyasem Khola Hydropower Project is a run-of-river type of hydropower project and has installed capacity of 43 MW with design discharge of 5.87 m3/sec and rated net head of 845.96 m. The project is capable of delivering 239.14 GWh (dependent system) of energy annually to NEA grid at proposed 132 kV at Pantan substation.