  • Project: Geophysical Investigation at Upper Nyasem Khola A Hydropower Project (21 MW)
  • Client: Sindhu Jwala Hydropower Company Limited
  • Location: Jugal Rural Municipality, Sindhupalchowk District
  • Date: Completed

The project consist of preparation of Geophysical Investigation of Upper Nyasem Khola-A Hydroelectric Project (21 MW), carry out the construction planning and scheduling and preparation of drawings. The consultant has completed all the assignment as per ToR.

The proposed Upper Nyasem Khola-A Hydroelectric Project (21 MW) is located in Jugal Rural Municipality, Bagmati Province, Nepal. The project area can be reach through a gravel road from Balephi up to Ambakharka. Ambakharka is located at a distance of about 45 km from Balephi Bazaar which is located on Araniko Highway. Balephi bazaar is located about 72 km north from Kathmandu. Upper Nyasem Khola-A Hydropower Project is a run-of-river type of hydropower project and has installed capacity of 21 MW with design discharge of 4.18 m3/sec and rated net head of 602 m. The project is capable of delivering 121.72 GWh of energy annually to NEA grid at proposed 132 kV at Pantan substation.

Overall Services provided by firm

The scope of the consultancy services includes, but not limited to, following major activities:


  • Establishment of 2D Electrical Resistivity sections SRT (total length of 790 m) and ERT (total length of 2080 m) to show different layers of lithological strata and thickness of the overburden colluvial and alluvial soil materials at Headworks, HRP, Portals, Penstock and Powerhouse areas.

  • Field test such as MASW (14 Nos.) is carried out to find depths of rock head and rock mass condition up to the depth of investigation.

  • Field test to find weak zones, fault zone and water bearing zones in the specified survey areas.

  • Field test to find out plane of weakness for slope stability, deformed zones in bedrock, slopes and slides, sheared zones etc.

  • Preparation of analytical results in standard graphical format

  • Report Preparation

Related Project

Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Project: Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Project: Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Baglung-Beu-Narethati Road Tunnel (7.5 km)

Project: Feasibility Study of Baglung-Beu-Narethati Road Tunnel (7.5 km)

Client: Department of Roads, Quality Research & Development Center (QRDC)

Date: Ongoing

Become a Client

Let's work together for better tomorrow. We help you organize and build your infrastructure projects.

Contact Us

Become our Partner

We have been providing value added services to foreign consulting firms from across the globe who may be interested to establish the business activities in Nepal.

Become Our Partners

Join Our Team

Work with passionate & result oriented people who are expert in their field and makes remarkable impact on what they are doing partnering with clients and community.

Career