Due Diligence Study of Seti Khola Hydropower Project (3.5 MW)

  • Project: Due Diligence Study of Seti Khola Hydropower Project (3.5 MW)
  • Client: Parbat Painyukhola Hydropower Co. (P.) Ltd.
  • Location: Paiyun Rural Municipality (former Saligram, Taklak and Urampokhara VDCs), Parbat District, Province No. 4
  • Date: Completed

The project consist of preparation of Due Diligence Study of the project for financing purpose with the consortium of banks which is lead by Siddhartha bank. The Consultant has completed all the assignment as per ToR.

The proposed Seti Khola Hydropower Project will utilize the flow available in Seti Khola which is the tributary of the Kaligandaki River. The Kaligandaki River is later evacuated into the one of the main river, Saptagandaki River in Deughat. As per the Feasibility Study Report and Power Purchase Agreement (PPA), the design discharge of the project is 4.85 m3/s at probability exceedance of 40%. The diversion weir is located near Khorpokhara village of Urampokhara VDC. All the headworks arrangement is located on the right bank of Seti Khola from where design flow is diverted from intake-gravel trap to settling basin via approach culvert of 35.0 m length. As per the Detail Design Drawings, the flow then passes through 3650 m long 1.7 m diameter headrace pipe up to surge shaft and then via 99 m long penstock pipe of 1.6 m diameter. The powerhouse is located at the terraced cultivated land on the hillside of the right bank of Seti Khola. The powerhouse consists of 2 units of horizontal axis Francis turbines to generate 3.5 MW power. The generated energy is proposed to evacuate at Lunkhu Deurali Substation, Parbat via 14 km long 33 kV Transmission Line.

Overall Services provided by firm

The scope of services includes, but not limited to, carrying out the following activities:


  • Review of the studies including hydrology, in general geology of the project area

  • Review of the project layout and project component design parameters

  • Review of the project cost estimates

  • Review of existing environment and likely adverse impacts.

  • Brief assessment of risk factors in the project

  • Review installed capacity and annual energy

  • Conclusion and Recommendation based on the findings.

  • Prepare of Due Diligence Report

Related Project

Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Project: Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Project: Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Baglung-Beu-Narethati Road Tunnel (7.5 km)

Project: Feasibility Study of Baglung-Beu-Narethati Road Tunnel (7.5 km)

Client: Department of Roads, Quality Research & Development Center (QRDC)

Date: Ongoing

Become a Client

Let's work together for better tomorrow. We help you organize and build your infrastructure projects.

Contact Us

Become our Partner

We have been providing value added services to foreign consulting firms from across the globe who may be interested to establish the business activities in Nepal.

Become Our Partners

Join Our Team

Work with passionate & result oriented people who are expert in their field and makes remarkable impact on what they are doing partnering with clients and community.

Career