Detailed Engineering Design of Upper Modi Hydroelectric Project (18.2 MW) under EPC contract

  • Project: Detailed Engineering Design of Upper Modi Hydroelectric Project (18.2 MW) under EPC contract
  • Client: WAIBA/RSC JV
  • Location: Bijeswari Marg. Swayambhu, Kathmandu-15, Nepal
  • Date: Ongoing

The project consist of preparation of Detailed Engineering Design of Upper Modi Hydroelectric Project ( 18.2 MW) or EPC Contractor. The project is licensed under Modi Jalvidyut Company Limited (MJCL) which is wholly owned subsider company under Nepal Electricity Authority. The main scope includes preparation of Design Basis Memorandum (DBM) of Civil & HM works, Detailed Topographical Survey Report, Preliminary Design of Project components (Preliminary Design & Drawings), Surface Geological Mapping, Geophysical & Geotechnical Investigation (ERT, MASW & Drilling), Detail Design Report (Detail Design, Construction & Reinforcement Drawings). 

The Upper Modi Hydroelectric Project (UMHEP) is designed to utilize the discharge from the tailrace of the Upper Modi A Hydroelectric Project (UMAHEP) through an interconnection system located at Kilyu village. The system comprises a 700 m long cut-and-cover reinforced concrete box culvert (3.2 m × 3.2 m), which diverts the design discharge of 16.15 m³/s to a headpond at Syauli Bazaar. The headpond (40 m × 10 m × 6.9 m) with a side spillway regulates flow into the power intake, maintaining water level at EL. 1164.60 m. From the intake (EL. 1167.90 m deck, EL. 1152.55 m invert), water enters the 4.244 km headrace tunnel (3.1–3.7 m diameter) leading to a 10 m diameter, 38.6 m high surge shaft located 13 m upstream of the valve chamber. The steel-lined penstock (2.35 m diameter, bifurcating to 1.66 m branches) conveys water to a surface powerhouse on the right bank of Modi Khola near Birethanti, housing two vertical-axis Francis turbines. The tailrace system, consisting of a cut-and-cover box culvert, safely returns the discharge to the Modi River, completing the cascade arrangement.

Overall services provided by firm

The main scope includes :


  • Preparation of Design Basis Memorandum (DBM) of Civil & HM works

  • Carryout Field Investigation including topographic survey, surface geological mapping, geophysical & geophysical investigations

  • Preparation of Preliminary Design of Project components

  • Carryout hydraulic design and preparation of relevant reports

  • Carryout geotechnical assessment, design and preparation of relevant reports

  • Carryout structural assessment, design and preparation of relevant reports

  • Preparation of detail design reports including construction drawings and reinforcement drawings

Related Project

Feasibility Study Report of Machha Khola – A Hydropower Project (9.30 MW)

Project: Feasibility Study Report of Machha Khola - A Hydropower Project (9.30 MW)

Client: Pani Bijuli Pvt. Ltd.

Date: Ongoing

Detailed Engineering Design of Lagan Khola (Brahmayani – A) Hydroelectric Project (9.7 MW)

Project: Detailed Engineering Design, Construction Drawing, Cost Estimation, BoQ Preparation and Tender Preparation works of Lagan Khola (Brahmayani - A) Hydroelectric Project (9.7 MW)

Client: Integrated Hydro Fund Nepal Pvt. Ltd.

Date: Ongoing

Updated Feasibility Study and Detailed Design Works of Super Melamchi Hydropower Project (23.60 MW)

Project: Updated Feasibility Study and Detailed Design Works of Super Melamchi Hydropower Project (23.60 MW)

Client: Milarepa Energy Pvt. Ltd.

Date: Ongoing

Become a Client

Let's work together for better tomorrow. We help you organize and build your infrastructure projects.

Contact Us

Become our Partner

We have been providing value added services to foreign consulting firms from across the globe who may be interested to establish the business activities in Nepal.

Become Our Partners

Join Our Team

Work with passionate & result oriented people who are expert in their field and makes remarkable impact on what they are doing partnering with clients and community.

Career