Detailed Engineering Design of Upper Brahmayani Hydroelectric Project (19.00 MW)

  • Project: Detailed Engineering Design of Upper Brahmayani Hydroelectric Project (19.00 MW)
  • Client: Integrated Hydro Fund Nepal Pvt. Ltd.
  • Location: Jugal Rural Municipality, Sindhupalchok District, Bagmati Province
  • Date: Ongoing

The project consists of preparation of Detailed Engineering Design & tender documents of camp facilities, civil works, hydro-mechanical & electro-mechanical works  of Upper Brahmayani Hydroelectric Project (BHEP – 19 MW), and other assignment as per ToR. The proposed Brahmayani Hydroelectric Project (BHEP) will utilize the flow available in Nyamya Masal Khola which is merges with Lagan Khola at Ladanbesi to form Balephi Khola, which later merges with the Sunkoshi River, the main tributary of the Sapta Koshi River Basin.

UBHEP has already completed a Power Purchase Agreement (PPA) with NEA and obtained the Survey License from DOED with a project capacity of 15.15 MW based on releasing 50% of downstream release from monthly flows. However, as per the recently amended guidelines of Physical Infrastructure Development and Operation in the protected areas, 2080 only 35% of the mean monthly flow is to be released as a downstream release for the project whose entire project layout lies in a protected area and has plant capacity lies below 25 MW. Therefore, the required downstream release is 35% of the mean monthly flow from Nyamya Masal Khola for power generation of UBHEP. The plant’s installed capacity is 19.00 MW as per updated project layout with a design discharge of 5.40 m3/s considering a gross head of 442 m and after downstream release.

As per the Updated Feasibility Study Report (Sept. 2024), the design discharge from Nyamya Masal Khola is 5.40 m³/s at a probability exceedance of 48.89%. The diversion weir (WCL 3070 m amsl) is located about 80 m downstream of the confluence of Nyamya Masal Khola (originating from Jugal Glacier) and a tributary from Dorje Lakpa Glacier. The headworks, including the diversion weir, intake, undersluice, gravel trap, and desander, are situated on the right bank of Nyamya Masal Khola. Similarly, the project waterways headrace pipe (1.5 m dia., 3,350 m length), surge pipe (3 m dia., 90 m length), and surface penstock (1.15–1.25 m dia., 1,674 m length) are located along the right bank. The proposed surface powerhouse is on the left bank of Lagan Khola, just upstream of the Nyamya Masal & Lagan Khola confluence at Ladanbesi, and will house two vertical-axis Pelton turbines. A bypass with an energy-dissipating structure is included to control water velocity during turbine shutdown and safely convey flow to the downstream headpond. If the downstream project is inactive, discharge will be released via the tailrace into Lagan Khola. Generated energy is planned to evacuate to the substation at the Brahmayani Hydroelectric Project (45 MW) via a 6 km, 132 kV single-circuit line, and subsequently to Pantang Sub-station through a 15 km, 132 kV dedicated single-circuit line.

Overall services provided by firm

The scope of services includes, but is not limited to, carrying out the following activities:


  • Recommend/carryout necessary additional filed Investigations (topographic survey, geophysical/geotechnical investigations and other necessary field investigation).

  • Review of previous feasibility study.

  • Project layout, Hydraulic design, structural design of different hydropower components

  • Design of preparatory works such as access road, bridge, camp facilities, etc

  • Preparation of inception report and updated projecting report

  • Preparation of bidding documents for camp facilities and design basis memorandum

  • Frequent site visit for layout verification

  • Preparation of tender documents for surface civil Works, all BOQ, construction schedule etc including updated feasibility report for DOED and banks of optimized project capacity.

  • Preparation of tender documents for hydro-mechanical Works.

  • Preparation of tender documents for electro-mechanical Works.

  • Detail Design Calculation Reports & Construction Drawings including reinforcement drawings for all components all complete in all respects.

Related Project

Feasibility Study Report of Machha Khola – A Hydropower Project (9.30 MW)

Project: Feasibility Study Report of Machha Khola - A Hydropower Project (9.30 MW)

Client: Pani Bijuli Pvt. Ltd.

Date: Ongoing

Detailed Engineering Design of Upper Modi Hydroelectric Project (18.2 MW) under EPC contract

Project: Detailed Engineering Design of Upper Modi Hydroelectric Project (18.2 MW) under EPC contract

Client: WAIBA/RSC JV

Date: Ongoing

Detailed Engineering Design of Lagan Khola (Brahmayani – A) Hydroelectric Project (9.7 MW)

Project: Detailed Engineering Design, Construction Drawing, Cost Estimation, BoQ Preparation and Tender Preparation works of Lagan Khola (Brahmayani - A) Hydroelectric Project (9.7 MW)

Client: Integrated Hydro Fund Nepal Pvt. Ltd.

Date: Ongoing

Become a Client

Let's work together for better tomorrow. We help you organize and build your infrastructure projects.

Contact Us

Become our Partner

We have been providing value added services to foreign consulting firms from across the globe who may be interested to establish the business activities in Nepal.

Become Our Partners

Join Our Team

Work with passionate & result oriented people who are expert in their field and makes remarkable impact on what they are doing partnering with clients and community.

Career