Construction Supervision and Management Works of 132 kV Double Circuit Transmission Line

  • Project: Construction Supervision and Management Works of 132 kV Double Circuit Transmission Line from Nupche Likhu Powerhouse (57.5 MW) To Garjyang Sub-Station
  • Client: Vision Energy and Power Limited
  • Location: Umakunda Rural Municipality, Ramechhap District, Bagmati Province, Nepal
  • Date: Ongoing

The project consists of providing Consulting Services for Construction Supervision and Management works of 132 kV double circuit transmission line project & its associated substation works that has been proposed to evacuate the power generated from Nupche-Likhu Hydropower Project (57.5MW) which is being constructed by Vision Energy & Power Ltd. 

The project consists of 24 km long 132 kV double Circuit Transmission Line for the Nupche Likhu Hydropower Project, with a capacity of 57.5 MW located in Umakunda Rural Municipality of Ramechhap district, Province No. 3, Nepal. The 132 kV Transmission Line is intended to be construction from Nupche Likhu Hydropower Project – 57.5MW (near Kongematar Village of Umakunda Rural Municipality) to NEA Substation at Gargyang of Gokulganga Rural Municipality.

Overall Services provided by firm

The scope of the consultancy services includes, but not limited to, following major activities:


  • Project Planning, Scheduling and Management of the transmission line project

  • Construction Supervision and Quality control of the project

  • Facilitation in procurement of transmission line works as per client’s requirement

  • Review & approval of transmission line alignment proposed by the contractor with respect to technical, social  & commercial aspects

  • Review & approval of tower spotting/design/schedule proposed by the contractor

  • Review & approval of tower optimization carried by the contractor using PLS tower & PLS CAD

  • Review of M4 analysis so as to optimize the overall cost of transmission line project. 

  • Review and recommendation of IPC proposed by the contractor

  • Preparation of periodic project reports

Related Project

Feasibility Study Report of Machha Khola – A Hydropower Project (9.30 MW)

Project: Feasibility Study Report of Machha Khola - A Hydropower Project (9.30 MW)

Client: Pani Bijuli Pvt. Ltd.

Date: Ongoing

Detailed Engineering Design of Upper Modi Hydroelectric Project (18.2 MW) under EPC contract

Project: Detailed Engineering Design of Upper Modi Hydroelectric Project (18.2 MW) under EPC contract

Client: WAIBA/RSC JV

Date: Ongoing

Detailed Engineering Design of Lagan Khola (Brahmayani – A) Hydroelectric Project (9.7 MW)

Project: Detailed Engineering Design, Construction Drawing, Cost Estimation, BoQ Preparation and Tender Preparation works of Lagan Khola (Brahmayani - A) Hydroelectric Project (9.7 MW)

Client: Integrated Hydro Fund Nepal Pvt. Ltd.

Date: Ongoing

Become a Client

Let's work together for better tomorrow. We help you organize and build your infrastructure projects.

Contact Us

Become our Partner

We have been providing value added services to foreign consulting firms from across the globe who may be interested to establish the business activities in Nepal.

Become Our Partners

Join Our Team

Work with passionate & result oriented people who are expert in their field and makes remarkable impact on what they are doing partnering with clients and community.

Career