In Nepal, standard contracts are used to execute/construct the transmission line where final design is to be carried out by the contractors with the preliminary tower schedule/design provided by the Employer. In such contracts, the variations in tower type after final design is the major issue where cost control is very challenging as normally, the project cost increases with heavy tower proposal from the contractor. So proper verification of proposed design by expert consultants are