After breakthrough of 2.53 km tunnel excavation in Lower Erkhuwa Hydropower Project, the final lining works is in full swing now. We are happy to share some of the photographs related to headrace tunnel final lining works. Proper execution of lining/support works as per site specific design is the key to long term stability as well as to ensure leakproof water tunnel. We, Energy and Infrastructure Maven Pvt. Ltd. has been engaged as Main Consultant