Due Diligence Study of Upper Phawa Khola Hydroelectric Project (5.8 MW)

  • Project: Due Diligence Study of Upper Phawa Khola Hydroelectric Project (5.8 MW)
  • Client: Unitech Hydropower Company (P.) Ltd
  • Location: Yangworak (former Thechampu, Tiringe, and Dumrise VDCs) and Sirijangha (former Sikaicha VDC) Rural Municipality, Taplejung District, Prvince no. 1
  • Date: Completed

The project consist of preparation of Due Diligence Study of the project for financing purpose with the consortium of banks which is lead by machhapuchhre bank. The Consultant has completed all the assignment as per ToR.

Phawa Khola is a tributary of Kabeli Khola, which in turn, is a major tributary of Tamor Nadi, a major river basin of Sapta Khosi river. The design discharge of the project is 2.60 m3/s at probability exceedance of 40% and as per the Power Purchase Agreement (PPA), the design discharge of the project is 2.52 m3/s at probability exceedance of 41.14 %. The diversion weir lies at Ose Dobhan village, approximately 400 m downstream of the confluence with Soyang Khola. All the headworks arrangement is located on the left bank of Phawa Khola from where design flow is diverted from intake-gravel trap to settling basin via approach canal of 40.0 m length. The flow then passes through 4357 m long 1.5 m diameter headrace pipe upto surge tank and then via 479 m long penstock pipe of 1.1 m diameter. The powerhouse is located on flood plain at left bank of Phawa Khola about 100 m downstream of the confluence with Siwa Khola. The powerhouse consists of 2 units of horizontal axis pelton turbines to generate 5.8 MW power. The generated energy is proposed to evacuate at Amarpur Substation via 8 km long 33 kV single circuit Transmission line

Overall Services provided by firm

The scope of services includes, but not limited to, carrying out the following activities:


  • Review of the studies including hydrology, in general geology of the project area

  • Review of the project layout and project component design parameters

  • Review of the project cost estimates

  • Review of existing environment and likely adverse impacts.

  • Brief assessment of risk factors in the project

  • Review installed capacity and annual energy

  • Conclusion and Recommendation based on the findings.

  • Prepare of Due Diligence Report

Related Project

Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Project: Due Diligence Study of Super Sabha Khola Small Hydropower Project (4.1 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Project: Due Diligence Study of Super Sabha Khola A Hydropower Project (9.412 MW)

Client: Sankhuwasaba Power Development Pvt. Ltd.

Date: Completed

Baglung-Beu-Narethati Road Tunnel (7.5 km)

Project: Feasibility Study of Baglung-Beu-Narethati Road Tunnel (7.5 km)

Client: Department of Roads, Quality Research & Development Center (QRDC)

Date: Ongoing

Become a Client

Let's work together for better tomorrow. We help you organize and build your infrastructure projects.

Contact Us

Become our Partner

We have been providing value added services to foreign consulting firms from across the globe who may be interested to establish the business activities in Nepal.

Become Our Partners

Join Our Team

Work with passionate & result oriented people who are expert in their field and makes remarkable impact on what they are doing partnering with clients and community.

Career